Search icon
  • ScreenConfigure
  • Balcony-1Details
  • HeadInsights
  • Building-1Projects
  • Papers
  • Videos

Filter

New Road Triangle, Feltham

Discover how Sapphire Balconies delivered 180 Glide-On™ balconies for the New Road Triangle development in Feltham, enhancing connectivity and creating a landmark building in line with Hounslow’s urban regeneration goals….
20231025_165640_hzmm6f-scaled
Building-1

South West Lands, Wembley

“My experience with Sapphire? Well, I wrote a long piece on LinkedIn about you! It’s been wonderful working with you – you people are a dream! The logistics team especially have been amazing.” Nana Aboagye, Senior Site Manager, Hills Partnership…
IMG_5448-e1749551211247
Building-1

Kew Bridge Gate (Buildings E-H), Brentford

“It’s been a good experience working with Sapphire.” – Jac Louw, Project Manager, EcoWorld London History Brentford has grown from small beginnings into a thriving residential hub, not least thanks to EcoWorld London’s newest development, Kew Bridge Gate. Adjacent to the grounds of Brentford’s GTech Community Stadium, EcoWorld London aspired to integrate the stadium and surrounding residential developments into one cohesive area, envisioning a new community development for the area. Executive Summary Regulatory Challenge and Insight: Uncertainty around NHBC guidance on balcony water management posed a significant challenge, prompting Sapphire to collaborate with Broadway Malyan and attend an NHBC presentation to gain clarity. Innovative Drainage Solution: Sapphire implemented controlled-draining soffits, reducing the need for rear-draining rainwater pipes (RWPs), enabling a more elegant, compliant, and cost-effective solution with savings of up to 25%. Efficient Installation Strategy: By using Sapphire’s Remote Locker Device (RLD), balconies were designed for streamlined installation within tight site boundaries, with no façade protrusions and safer crane lifts. Streamlined by Collaboration: Proactive engagement and cross-team collaboration ensured Kew Bridge Gate met regulatory demands while achieving practical, aesthetic, and economic advantages. Streamlined by Collaboration, Delivered by Sapphire Regulatory Challenge and Insight EcoWorld London and architect Broadway Malyan and AFL aspired for this development to use a controlled edge drainage system, though the main constraint felt was around the then-unresolved status of NHBC guidance on water management and whether controlled drainage could be effectively used on balcony projects made this decision difficult. Sapphire ensured that Kew Bridge Gate could be streamlined by collaboration. We attended an NHBC presentation alongside Broadway Malyan Architects to further understand what the then-current guidance around water management would be. Having an ever-increasing knowledge of construction guidance and regulations is incredibly and increasingly important, especially considering the impact of the new Building Safety Regulator on the construction landscape. Innovative Drainage Solution Having learned directly from the NHBC, we implemented controlled-draining soffits on the balconies at Kew Bridge Gate to effectively manage the drainage without the need for a rear-draining rain water pipe (RWP). The impact of this meant that controlled free drainage, an elegant and cost-effective solution to water management (often saving 25% in cost due to not needing an RWP), could be used. Efficient Installation Strategy In another instance of streamlining by collaboration, we worked alongside Broadway Malyan and AFL to design balconies that could be installed using our Remote Locker Device (RLD). Due to the tight site boundaries, an RLD installation was advantageous as the balconies could be transported to site and installed with the balcony arms situated inside the Cassette® itself, meaning no arms protrude from the building façade before installation and balconies can be craned up closer to the building façade, keeping the tight site boundaries in place.
IMG_3908_j84vad-e1742380745547
Building-1

Upton Park, Block C

Sapphire Balconies partnered with Barratt Homes to deliver 119 prefinished balconies at Upton Park Block C in Newham. Through offsite manufacturing and efficient logistics, we streamlined installation, overcame planning constraints, and enhanced build quality from start to finish….
SAP001_35_SapphireBalconiesSouthallWaterside_03_PRINT_mzs93o-e1742380116428
Building-1

The Green Quarter Phase A, Blocks G & H

Explore how Sapphire Balconies collaborated with Berkeley St James Group and JTP Architects to deliver 130 balconies at The Green Quarter, Southall. Discover how offsite manufacturing and streamlined installation addressed site constraints, enhancing efficiency and quality….
Hollybrook-Chequers-Lane-28
Building-1

Chequers Lane, Dagenham

“I’ve been working with Sapphire for around 10 years. Good as gold and wish every company would take a leaf out of your book. 10/10. – Project Manager, Hollybrook Limited History Developed in tandem with Transport House, Kerwin House (formerly the Chequers Lane development) was a redevelopment of the Ford Stamping Plant in Dagenham,…
Roneo-Corner-Edited-2-e1738845454712
Building-1

Roneo Corner

“Sapphire came forward with solutions when needed and can’t see any problems on this project either.  I’ll give you a 10 overall!” – Senior Site Manager, Hollybrook Limited History Romford has a storied history in North East London, originally the administrative centre of Havering and with good road links to the centre of London….
IMG_6210-1-e1738149818276
Building-1

Transport House, Dagenham

“I’ve been working with Sapphire for around 10 years. Good as gold and wish every company would take a leaf out of your book. 10/10. Project Manager, Hollybrook Limited History Situated on the former site of the Unite trade union in Dagenham, Transport House brings 149 new residential units to the area, with the…
Submit a Project with SapphireNews Overlay

Have you saved a project yet?

Organise and access your balcony project details with ease.

20250108_141811_ccncla-e1739269597895-1
Building-1

300 Harrow Road

 “The experience with Sapphire has been good, you’re a really good company to work with.” Senior Site Manager, 300 Harrow Road History Situated in Westminster and supported by Westminster City Council, 300 Harrow Road featured over 1,400 metres of community facilities, 112 new homes, 50% of which are designated as affordable. Willmott Dixon have…
OVD2021007D00004_pyxs3t-e1738574037955
Building-1

Imperial Clockhouse, Bromley-by-Bow

History An ambitious project, supporting the delivery of a new district centre in Bromley-by-Bow, Imperial Clockhouse aims to regenerate a former scaffolding yard and a group of derelict low-rise industrial buildings, vacant since 2011. The project, consisting largely of affordable housing, features 79 of Sapphire’s Glide-On balconies, on which we were pleased to be…
Deptford-Installation-RLD-3-1
Building-1

Deptford Wharves, Plot 4

“It’s gone well on the whole – the experience with Sapphire has been very good.” Envelope Package Manager, Lendlease History Once a royal dockyard, constructed under the purview of Henry VIII, the Deptford Landings project is a mixed-use urban regeneration development located in the northern region of the London Borough of Lewisham. Deptford is…
DJI_20250604235507_0291_D
Building-1

Vienna House, Vancouver

Sapphire Balconies check a lot of boxes of the goals of the Vienna House project charter – they’re durable, support resilience by providing passive shading, and they improve quality of life for residents….
West_Way_-_Botley-177_evmkz8-e1736420254445
Building-1

West Way Place, Botley

 “Working with Sapphire has been a five-star experience, been very accommodating and helpful, sharing so much. Very smooth process.” Site Engineer, Westway Place History Located just west of the Oxford city boundary, Botley is a thriving community on the Seacourt Stream, acting as a suburb of Oxford itself. Mace Group have created Westway…
Didsbury_completion-1_vte9rm-e1734347182162
Building-1

The Didsbury, East Ham

 “It’s been a really good experience; you can have a 10/10!.” Alex Impraim, Project Manager, Bugler Developments Ltd. History Located in the former Town Hall Annex (the Brian Didsbury Centre), this new development in the heart of East Ham blends a 1930s art-deco style sensibility with modern amenities, providing the residents of this London suburb…
  • previous icon
  • 1
  • 2
  • 3
  • ...
  • 9
  • next icon

What's Our Approach?

What are you aspiring for ?

We're here to help bring your project vision to life. Whether it’s standout design, smoother delivery, or something completely unique, Sapphire works with you to achieve your goals and streamline your balcony journey.

Speed Icon

What are you constrained by ?

Each project comes with a set of challenges - tight timelines, complex sites, or logistical hurdles. At Sapphire, we thrive on turning those constraints into innovative solutions, moving you from complexity to clarity.

Speed Icon
StreamlinedBy Icon

Streamlined by Sapphire

Sapphire strives to make the balcony journey seamless, from early design input to precise offsite manufacturing and smooth on-site delivery. Sapphire helps you to build smarter, faster, and with complete confidence.

Speed Icon

What Is Our Project Pathway?

  • 01check true animation
  • 02check true animation
  • 03check true animation
  • 04check true animation
  • 05check true animation
  • 06check true animation
concept-design-dark
Step 1

Concept Design

We streamline early balcony design to meet aspirations, solve challenges, and ensure smooth, efficient installation.
design-dark
Step 2

Design

Our prefabricated system enables fast, cost-effective balcony design with standard or custom options.
offsite-roduction-dark
Step 3

Offsite Reduction

We maximise offsite production for faster, high-quality balcony installs with efficient manufacturing and logistics.
logistics-dark
Step 4

Logistics

We ensure fast, safe balcony delivery with offsite production, smart logistics, and full traceability.
Procurement-darkProcurement-white
Step 5

Procurement

Our robust quality process ensures every balcony meets high standards throughout procurement, production, and installation.
On-Site-dark
Step 6

On-Site

We provide training and tools to make balcony installs faster, safer, and easier.

Ready To Streamline Your Balcony Journey?

Contact form background Shape

Need Some Help? Speak To Our Experts

need help background shape