Wembley Alto, London

blue banner background overlay
Client:Quintain Estates
Contractor:Wates Construction
Architect:Flanagan Lawrence
Location:Brent, London
Balconies:372 Cassette® Balconies
Share Case study:

Challenge

The Wembley Alto project had an array of challenges from the long projection of the balconies to the internal fan extraction into the balconies. Other requirements included the need for top-down installation to save time, GRC effect on balconies, and balcony lighting. The Large projections with an angled soffit are intended to improve the views and usability of the balconies whilst hiding the apartment extracts within the balcony.

Solution

Sapphire’s innovative Glide-On™ connectors enabled a Rigid connection back to the building that far outperforms the British Standards L/180 structural deflection limits. With some of the balconies having a 1725mm projection from the facade, by BS EN Standards, this would be allowed to deflect by 9.6mm at the extent. The Soffits are perforated to let the extracts discharge to the balcony below. (I.e. the balcony which belongs to the apartment the extract belongs to.) These large and rigid balconies for Wembley Alto install speeds exceeded 30 in a day. Something made possible through the simplistic balcony design which simply slides into place. Watch the video below to see for yourself a day where 30 balconies were installed safer and faster than traditional methods could have achieved.

 

Related Resources

Overview Positioned prominently on Edgware Road in Marylebone, West End Gate by the Berkeley Group combines refined architecture with…

Testimonials

I can’t fault Sapphire’s products or service on this challenging project.

Quote image

- Project Director, Wates Construction