Maintenance and Replacement Key Points
Like any product, to achieve optimal performance and longevity, maintenance and replacement of parts must be carried out systematically. Whilst routine planned balcony maintenance of the balcony’s structure may not be required, we advise for a periodic (max 5 yearly) investigation of a representative proportion of the installations to be made. This is to identify any premature ageing or developing conditions. This should involve visual checks looking for material deterioration (e.g. rotting or delamination), component tightness, and damage (e.g. chips on glass) which could lead to premature ageing or failure.
To assist with balcony maintenance, we have worked to simplify product design to enable safe but replaceable components where possible and have experience of assisting designers to incorporate components like abseiling hooks on specific projects for maintenance and cleaning purposes.
For recommended inspection and maintenance of decking on balconies we recommend that you reach out to our sister company Mydek.
Cleaning Drip Trays Key Points
When looking at drainage the NHBC consider what happens when outlets are blocked. Our Cassette® balconies have multiple drip trays which have two benefits. Firstly, on a free draining balcony water collects and moves to the front of each drip tray avoiding reliance on a single outlet. Secondly, individual drip trays can be replaced from below making cleaning drip trays much easier.
By their very nature, balconies and balustrades are often at high altitude and form edge protection. To reduce safety risk exposure or product issues, the design must take appropriate precautions to achieve or exceed regulatory requirements and industry guidance.
Consideration of operating Instructions risks should include:
Whilst each project should have its specific O&M (Operation and maintenance) manuals for the balconies, emergency conditions must be part of the design considerations so that if an emergency condition such as a product failed, the safety risk is minimised as quickly as possible. For example, with glass, should a glass panel fail through impact, vandalism or failure, this could result in an exposed edge and should have an emergency procedure.