Header background
22824_-_308_zpkbxs-e1724834490232.jpg

Archers Wood, Delgany

blue banner background overlay
Client:Cairn PLC
Contractor:Barrett Mahoney Consulting Engineers (BMCE)
Architect:BBA Architecture
Location:Delgany, Wicklow
Balconies:63 balcony lifts
Share Case study:
Loading...

Archers Wood is a modern residential development located in Delgany, County Wicklow, one of Ireland’s most desirable coastal communities. Positioned close to Greystones and the Irish Sea, Delgany combines historic village character with growing demand for high-quality residential living.

The name Delgany originates from the Irish word “Deilgne”, meaning “place of thorns,” referring to the dense woodland that once surrounded the area. Today, developments such as Archers Wood reflect the village’s evolution, blending contemporary architecture with the natural landscape and established community.

Project Overview

Archers Wood forms part of a large residential scheme designed to support the continued growth of the Greystones–Delgany area. For this project, Cairn PLC required a balcony solution that could deliver consistent quality while supporting efficient construction across multiple buildings.

Sapphire was appointed to design, manufacture and deliver a balcony system that would simplify installation, reduce on-site complexity and support a repeatable process across Cairn’s expanding residential developments.

Streamlined by Innovation, Delivered by Sapphire

Cairn PLC set out with the ambition to create a replicable balcony installation process that could be implemented consistently across future developments. Achieving this required a balcony solution supported by the right expertise, supply chain structure and installation methodology.

Without a streamlined system, balcony design and installation can introduce unnecessary complexity into residential construction programmes. Cairn therefore sought a partner capable of delivering both a proven balcony product and a clear delivery strategy.

Sapphire brought extensive experience in offsite manufactured aluminium balcony systems, helping the project team understand complex structural interfaces and the benefits of adopting a systemised balcony approach.

By applying a methodology refined across numerous residential projects, Sapphire provided clear guidance on buildability, installation sequencing and design coordination. This enabled the Archers Wood development to benefit from a more efficient balcony journey while providing Cairn with a model that could be replicated across future schemes.

Streamlined by Sapphire

Through careful design coordination, offsite manufacturing and a proven delivery methodology, Sapphire helped simplify the balcony process from specification through to installation. This approach reflects our commitment to creating balcony solutions that are streamlined by innovation.

Balcony System and Specification

The project utilised Sapphire’s Glide-On™ aluminium Cassette® balcony system, a modular balcony solution designed for offsite manufacture and rapid installation. By manufacturing balcony structures offsite, the system reduces site labour requirements while maintaining consistent quality and performance.

Key Specification Features

  • Balcony System: Glide-On™ aluminium Cassette® balconies with flat infill vertical bar balustrades
  • Balcony Anchors: Cast-in M30 and M16 anchors incorporating thermal breaks
  • Structural Arms: Two-piece galvanised steel support arms
  • Cassette Structure: Standard 400mm modular Glide-On™ Cassette® balconies
  • Soffits: Polyester powder-coated aluminium with controlled drainage
  • Deck Finish: Enjura® decking fixed with hidden clips
  • Toprail: 60 x 35mm sloped aluminium top profile capping
  • Guarding: 40 x 12mm flat infill vertical bar balustrades
  • Fascias: Polyester powder-coated aluminium fascia trim behind vertical bars

Collaborative Delivery

The success of the Archers Wood project highlights the value of early collaboration between developer, architect, engineer and balcony specialist. By aligning design requirements with installation strategy, the project team was able to streamline balcony delivery while maintaining the architectural intent of the development.

As part of this collaborative approach, Sapphire worked closely with the project team to ensure the balcony systems were integrated effectively into the overall construction programme.

Client Feedback

“It’s been a good experience working with Angus and the team at Sapphire. No issues.”
Tommy Carey, Project Manager, Cairn PLC

Ready To Streamline Your Balcony Journey?

Contact form background Shape
customer-icon-with-circle-white

Need Some Help? Speak To Our Experts

need help background shape