Published Date:27/09/18
| Client: | Rowlinson Construction |
| Contractor: | Rowlinson Construction |
| Architect: | Nicol Thomas Limited |
| Location: | Trafford, Manchester |
| Balconies: | 112 Cassette® Balconies |
The Pomona Wharf project was built by Rowlinson Construction using modern construction methods, with all the wall panels being manufactured off-site with an RC frame and then simply installed on the building. The key requirement for us on this project was to fit with the short program and help reduce costs of balcony install.
Modern Methods of Construction (MMC) is an ingenious way of tackling the modern housing crisis and saving on cost, without compromising on quality. Offsite modular construction allows the elements of a building to be constructed to the high standards expected of a controlled assembly line environment while also being significantly faster and more efficient.
To ensure a perfect blend with the construction program, we manufactured and stored all the pre-assembled balcony at our Winchester production facility allowing balconies to be delivered to site as required in the install sequence minimising wait times and to maintain the schedule.

- Project Manager, Rowlinson Construction